OIL & GAS
Oil and gas projects require clearly defined control, isolation or shutdown duties, together with the process envelope, actuation strategy and project documentation.

SELECTION REVIEW
Define the duty and failure position.
Applicable standards, certification and compliance must be verified for the selected configuration and destination market.
- 01Process envelope
Fluid composition, design pressure and temperature.
- 02Valve duty
Control, routine isolation or emergency shutoff.
- 03Mechanical interface
Connection, piping standard, orientation and installation limits.
- 04Actuation
Power source, control signal, accessories and fail position.
RELEVANT PRODUCTS
Control and isolation, reviewed together.
The product family is a starting point; the project specification determines the final configuration.
PROJECT DUTY