DQSVVALVERequest a quote
03 · EPC Energy Supply ChainPhased on-time dispatch · Repeat framework orders

Coordinating phased multi-category valve batches and traceable QA dossiers for EPC construction sites

Executed long-term phased supply of manual stainless globe, Y-pattern globe, gate, pneumatic and electric valves for downstream energy EPC projects, pairing every shipment with independent inspection dossiers and export-grade protective packing.

  • Manual, pneumatic & electric scope
  • Shipment-indexed MTR & test packs
  • Moisture-sealed crate protection
01

Project background & significance

Zhejiang Hongwei Supply Chain Group is a leading supply-chain platform serving nuclear, power, petrochemical and energy infrastructure EPC projects. Through a 2022–2026 long-term partnership, DQSV delivers multi-category valve packages across downstream construction sections requiring flexible scheduling and standardized quality control.

02

Operating challenges & site constraints

Downstream EPC sites call off wide-ranging manual, pneumatic and electric valve specifications on overlapping, fragmented schedules. Conventional supply often suffers from mixed-batch mislabeling, incomplete accompanying certificates or flange damage and corrosion during multi-leg overland transport, delaying site warehouse acceptance.

03

Valves supplied & material configuration

Full-line industrial packages combining manual stainless globe, Y-pattern globe and gate valves (DN15–DN600, PN10–PN40 in WCB, CF8, CF8M and 316L), pneumatic control and shutoff valves (DN15–DN200, PN16–PN40) and electrically actuated gate, globe and butterfly valves.

04

DQSV engineering & QA response

DQSV established a dedicated EPC order ledger integrating flexible CNC production scheduling, 100% shell and seat hydrostatic testing, actuator torque/stroke calibration, shipment-specific QA document packs (MTRs, test certificates, packing lists) and rust/shock/moisture-proof crating with full flange protection.

05

Verified project outcome

All phased shipments from 2022 to 2026 arrived on time with intact flange surfaces and 100% complete inspection documentation, clearing site receiving inspections on the first check and earning continuous repeat orders.

  • On-time phased dispatch across overlapping EPC construction call-offs from 2022 through 2026
  • 100% complete batch-indexed material certificates, hydrostatic test reports and packing lists upon arrival
  • Zero transport flange damage with first-pass site warehouse acceptance and sustained repeat purchasing