Coordinating phased multi-category valve batches and traceable QA dossiers for EPC construction sites
Executed long-term phased supply of manual stainless globe, Y-pattern globe, gate, pneumatic and electric valves for downstream energy EPC projects, pairing every shipment with independent inspection dossiers and export-grade protective packing.


Project background & significance
Zhejiang Hongwei Supply Chain Group is a leading supply-chain platform serving nuclear, power, petrochemical and energy infrastructure EPC projects. Through a 2022–2026 long-term partnership, DQSV delivers multi-category valve packages across downstream construction sections requiring flexible scheduling and standardized quality control.
Operating challenges & site constraints
Downstream EPC sites call off wide-ranging manual, pneumatic and electric valve specifications on overlapping, fragmented schedules. Conventional supply often suffers from mixed-batch mislabeling, incomplete accompanying certificates or flange damage and corrosion during multi-leg overland transport, delaying site warehouse acceptance.
Valves supplied & material configuration
Full-line industrial packages combining manual stainless globe, Y-pattern globe and gate valves (DN15–DN600, PN10–PN40 in WCB, CF8, CF8M and 316L), pneumatic control and shutoff valves (DN15–DN200, PN16–PN40) and electrically actuated gate, globe and butterfly valves.
DQSV engineering & QA response
DQSV established a dedicated EPC order ledger integrating flexible CNC production scheduling, 100% shell and seat hydrostatic testing, actuator torque/stroke calibration, shipment-specific QA document packs (MTRs, test certificates, packing lists) and rust/shock/moisture-proof crating with full flange protection.
Verified project outcome
All phased shipments from 2022 to 2026 arrived on time with intact flange surfaces and 100% complete inspection documentation, clearing site receiving inspections on the first check and earning continuous repeat orders.
- On-time phased dispatch across overlapping EPC construction call-offs from 2022 through 2026
- 100% complete batch-indexed material certificates, hydrostatic test reports and packing lists upon arrival
- Zero transport flange damage with first-pass site warehouse acceptance and sustained repeat purchasing

Xi’an Nuclear Equipment Co., Ltd.
Re-engineering nuclear-auxiliary control and isolation valves after mid-project duty revisions
View case study
CNNC Research & Engineering Institutes
Customizing small-batch control and shutoff valves for compact CNNC research and engineering loops
View case studyPlanning a similar valve package?
Share your medium, pressure-temperature envelope, dimensional limits and inspection requirements. DQSV engineers will review sizing, materials, actuation and batch documentation.